MIB FrameSpace — Affordable high performance building technology

Tel: 029 2047 1053

Email: info@mibframespace.com

Cardiff City Academy

  • Cardiff City Academy
  • Cardiff City Academy
  • Cardiff City Academy
  • Cardiff City Academy
  • Cardiff City Academy
  • Cardiff City Academy
  • Cardiff City Academy
  • Cardiff City Academy
  • Cardiff City Academy
  • Cardiff City Academy
  • Cardiff City Academy
  • Cardiff City Academy
  • Cardiff City Academy

Project Cardiff City Football Academy

Client Steve Borley/Cardiff City FC

Location Cardiff, Wales

 

Type Football Academy

Sector Leisure

Started August 2010

Area

 

Scope of Works

Consists of 2 phases phase 1, which is a double storey building 136mm MIB MetSIP Lite Panel to ground floor 150mm Hollowcore floor, power floated finish. 86mm MIB MetSIP Lite Panel to 1st floor with a flat roof built up of 254mm roof cassettes 22mm Caberdek with trocal finish.

 

Phase 1

A single storey with 136mm MIB MetSIP LIte Panel 150mm Hollowcore power floated finish.

Sustainability

The MIB FrameSpace system is a class leader in terms of environmental and energy performance standards.