Project Cardiff City Football Academy
Client Steve Borley/Cardiff City FC
Location Cardiff, Wales
Type Football Academy
Sector Leisure
Started August 2010
Area —
Scope of Works
Consists of 2 phases phase 1, which is a double storey building 136mm MIB MetSIP Lite Panel to ground floor 150mm Hollowcore floor, power floated finish. 86mm MIB MetSIP Lite Panel to 1st floor with a flat roof built up of 254mm roof cassettes 22mm Caberdek with trocal finish.
Phase 1
A single storey with 136mm MIB MetSIP LIte Panel 150mm Hollowcore power floated finish.
The MIB FrameSpace system is a class leader in terms of environmental and energy performance standards.